...
No | Task | Estimation (hrs) | Comments | |||
---|---|---|---|---|---|---|
1 | Create Connection | |||||
1.1 | UI for adding connection details, and test connection | 8 | ||||
1.2 | Back end for adding, testing and saving the connection to DB | 1416 | ||||
2 | Fetching AD fields | |||||
2.1 | UI to select AD fields that needs to be synced to Jira | 8 | ||||
2.2 | Back end for fetching AD fields | 1416 | ||||
2.3 | Back end to save the selected AD fields in DB | 14 | 3 | 16 | ||
3 | Field Mapping | |||||
3.1 | UI to select custom field mapping | 16 | ||||
3.2 | Back end to save the custom field mapping in DB | 16 | ||||
4 | Synchronization | |||||
34.1 | UI to select the time of sync | 8 | ||||
34.2 | Back end to save the sync time in DB | 1016 | ||||
34.3 | Back end to sync AD fields to Jira | 204 | ||||
5 | Configuration | |||||
45.1 | UI for showing the config with options such as Reset, Edit, Delete, Disable | 10 | ||||
45.1.12 | Back end to update, delete and disable the config options | 16 | 4.2 | Back end for fetching config info | 10 | |
5 | 6 | Testing and Documentation | ||||
56.1 | Testing the plugin | 8 | ||||
56.2 | Updating the Document | 8 | ||||
Total | 148hrs182 |
Topics that POC Required on:
APIs for Active Directories that we are going to implement
Import configuration option
Synchronization